Bridge Crane Rehab for a Muncie Galvanizing Plant

Case Study

A galvanizing plant in Muncie, Indiana had a bridge crane in need of some serious assistance. Galvanizing is a process by which metal pieces and equipment are coated by molten zinc, making them many times more resistant to oxidization. The hot-dip galvanizing process involves some extremely corrosive chemicals (most notably hydrochloric acid [HCL]) that have a hugely damaging effect on any metal equipment used in the galvanizing process. Even the hardiest steel bridge crane can’t stand long against that kind of daily caustic bombardment… we should know, because the 10-year-old bridge crane in question was one of our own – a 10-ton single-girder top running unit that CraneWerks designed, built and installed in 2010. Under normal circumstances and with regular maintenance, this crane would’ve lasted 30 years or more without breaking a sweat. After a single decade in this environment, though, it looked more like a 100-year-old crane than a 10-year-old one.

Application

  • Customer: A Muncie, Indiana galvanizing plant that’s part of a multinational galvanizing and metal treatment corporation.
  • Dealer: Harriman Material Handling
  • Rehabber/Installer: CraneWerks, Inc.
  • Original Manufacturer/Dealer: CraneWerks, Inc./Harriman Material Handling

Process

CraneWerks replaced the crane’s old end trucks with entirely new ones. We refurbished the entire crane: girder, all parts (including hoists) and particularly the flange, which was especially deteriorated. We also replaced the old controller with a new VFD (Variable Frequency Drive) unit, which offers improved load control, greater efficiency and increased hoist life.

Challenges

To breathe new life into a crane that looked to be on its last legs. The 10-ton single-girder top running overhead bridge crane – that CraneWerks had designed, built and installed for them 10 years earlier – was a pitted-out mess, with a deteriorating flange, end trucks in danger of falling off the girder, and a pair of hoists that seemed ready to give up the ghost.

Results

Customer received a completely rejuvenated 10-ton, single-girder crane for a fraction of the price of total replacement; a crane ready to face the rigors of day-to-day duty in this particularly challenging and caustic work environment.


Ready to optimize your lifting operations with tailored solutions like our galvanizing client? CraneWerks is here to engineer custom lifting solutions that meet your unique needs, even in challenging spaces.

Contact us today for a personalized consultation and quote. Let’s work together to transform your lifting capabilities, enhance efficiency, and boost your bottom line. Don’t let space constraints limit your potential – reach out to CraneWerks now!

For more information: